Orecco Electric Extends the Workshop for Prefabriated Compact Substation for Fast Growing Demand

With the skyrocketing demand for prefabricated compact substation, the old workshop of Orecco Eleectric could not satisfy the monthly turnover pressure in the near future, so they extended the new workshop to ensure production capacity.

China-based electric power distribution and transmission solution provider Orecco Electric has won a reputation across the world for providing low-cost options for companies of all sizes seeking a secondary power distribution provider.

These customers have been loyal and comeback to Orecco Electric as they and their needs have grown. In the exciting recent news, Orecco Electric has won a bid in Egyptian for a power distribution project a few months ago, this order needs large production capacity and fast delivery, so the board of directors decided to extend a new workshop specializing in manufacturing the prefabricated compact substation.

“The original area limited our turnover and production speed,” commented a spokesperson from Orecco Electric. “Our expert team confirmed the need to expand the production line of our compact substation so that we could increase its production capacity by around three million.”

Orecco Electric's decision to meet this challenge include increasing the size of the production line workshop to 2000 square meters.

Due to their smaller size, prefabricated compact substations are often housed outdoors, taking up a relatively small space. They are most often used for residential quarters, city public utilities and to supply power for construction companies and similar projects. A wide range of choices in this area is available according to customer requirements.

The compact substations themselves are made to the highest standards, using the current leading technology both in design and manufacture, focusing both on productivity and safety requirements. Its frame is designed to be resistant to normal environmental conditions, delivering trusted protection from the elements, backed by a 20-year guarantee of being rust-free.

The capacity of the distribution transformer is in the range of 100KVA to 1250KVA, with its maximum not exceeding 1600KVA. 

Orecco Electric have established themselves as the “go-to” global source in the prefabricated compact substation space.

Expect more news on the Egyptian project from Orecco Electric soon.

For more information be sure to visit https://www.orecco.com/prefabricated-compact-substation.

Contact person: Tony Wang
Contact details: oreccoelectric@gmail.com
Tel No.: (+86)13757732033

Source: Orecco Electric

Related Media