Ram Jack Helicals Anchor Test Bed Requiring 1,000,000 Lbs Capacity

Ram Jack Lowers Industrial Testing Facility Building Costs with Helicals

Applied Fiber, a testing company in terminated synthetic fiber systems, needed a rope termination test bed installed. The catch? It had to be able to withstand 1,000,000 lbs of capacity. The original plan incorporated concrete that would cost hundreds of thousands of dollars. Using an economic stabilization plan, Ram Jack Solid Foundations used helical piles to support the new test bed, allowing the company to save resources while still having the highest quality of foundation solutions.   

In order to test rope terminations, Applied Fiber needed to install a test bed that would require a massive 1,000,000 lbs of load capacity. All was going well -- until they discovered it would cost $500,000 to create a concrete anchor big enough to manage such loads. Alternatively, the project engineer suggested using helical piles. And that’s where Ram Jack Solid Foundations entered the scene.

The original proposed plan consisted of 20 5.5” diameter helicals to each manage 90 kips of load. However, wanting to offer the most economic solution, Ram Jack altered the plan. Instead of using 5.5” helicals, Ram Jack engineers proposed using 3.5” helicals that would each manage 45 kips of load. The plan was accepted and installation ensued.

With the resource-savvy plan, Ram Jack installed a total of 32 3.5” diameter piles to stabilize the test bed providing them with unshifting load capacity for years to come. The smaller diameter piles provided Applied Fiber with a solution that was on time and under budget.

Source: Ram Jack

Related Media

About Ram Jack

Ram Jack provides quality foundation solutions, from residential to commercial. Our in-house engineers and research and development divisions continually strive to advance industry knowledge in foundation solution applications of steel piles.

Ram Jack
13109 CR 1556
Ada, Oklahoma
74820

Contacts


More Press Releases